Case Studies

At Smiths we pride ourselves on delivering projects, regardless of size, at the best price and in a professional manner.

Whittington Road, Worcester

Whittington Road, Worcester

Smiths Demolition team are currently tasked with the demolition, clearance and asbestos removal works of a former Defra site situated in Worcester.

Read more

BASC Gamekeepers’ Fair 2016

Smiths Waste Management supplied equipment and three members of staff to dispose of the waste created by thousands of exhibitors and members of the public at the BASC Gamekeepers’ Fair 2016 .

Read more

Tesco Store Cullompton, Devon

The project comprised of the soft stripping of buildings, removal of asbestos, demolition of the structures and the crushing and screening of all hardcore.

Read more

Weston Beach Race 2015

Smiths Event Waste Management supplied equipment for Weston Beach Race 2015 in order to best deal with the waste produced at the event and recycle at the highest possible rate.

Read more

Cheltenham Racecourse 2015

The new grandstand project was awarded to main contractor Kier at an original total value of £45 million. The contract encompassed the construction of new member’s facilities, new bar areas, additional toilets, improved viewing of the course and parade ring and additional grandstand capacity for 6,500 people together with a new Royal Box. The new grandstand replaces an original building constructed in the 1920s.

Read more

Clifton Cathedral

Smiths Asbestos Removal were sub-contracted by William Anelay Ltd to carry out the works on the roof of Clifton Cathedral.

Read more

RAF Rissington

The works comprised of asbestos removal, demolition of 29nr buildings and crushing of hardcore on site.

Read more

Frampton Country Fair, 2015

Frampton Country Fair took place on Sunday 13th September 2015 at Frampton Court Estate. Smiths Event Waste Management team were on hand to cover all waste management needs throughout all 30 acres of the park during the Country Fair.

Read more

Cheltenham Racecourse (Demolition)

Smiths Demolition team were employed to undertake the demolition and asbestos removal works of the Tote Stand, the See You Then Bar and various other buildings within the new development area.

Read more

Netheridge Annex

Four operatives from Smiths Demolition team were challenged with dismantling and disposing of nine redundant exhaust outlets from the engines which had been removed from Netheridge Sewage Treatment Works, Gloucester. They had previously been used as a backup if power failed to the main pumps. The dismantling process involved chain lifting blocks, pallet trucks and an overhead crane.

Read more

Cotswold BMW, Cheltenham (on-going)

Construction of a new central Headquarters for BMW and Mini Dealership to serve both Cheltenham and Gloucester. The Dealership will be located at the Cheltenham end of the Golden Valley Bypass adjacent to the Park-and-Ride site, in a green field location.

Read more

Cannington Court

This project is for EDF's European training centre and is built in and around a 900 year old Grade I Listed building. The building has had a lot of archaeological interest due to its changing use from a Benedictine Nunnery to its present day use.

Read more

CLA Game Fair 2015

Smiths Event Waste Management Team provided 600 wheelie bins, 4 RCV's (waste collection lorries) and 4 Groundhog/ Gators (4x4 small tractor vehicles) with trailers to ensure that the site was kept clean throughout set up, event days and breakdown. Smiths ensured that the site was prepared for the expected 1500 Exhibitors and 150,000 visiting public during the 3 day events.

Read more

Wickes, Cirencester

Working as a sub-contractor to Barnwood Construction for the new construction of a Wickes store in Cirencester.

Read more

Call us on 01453 822227 to find out how we can help you.