Triumph Group, Staverton

Client: Barnwood Construction Staverton Before1

Location: Staverton, Gloucester

Site Manager: Tim Hughes

Contracts Manager: Mark Virgo

Quantity Surveyor: Mike Wilcox

Duration: 11 months

Project Overview:

The construction of Triumph Actuation Systems’ new facility for the design, development and assembly of aircraft landing gear which is located on the old Golden Castle Caravans site next to Gloucestershire airport.

Front, High Level, RHS, close up

Scope of Work:

Smiths were involved from start to finish carrying out site clearance, all aspects of groundworks including an 825mm diameter storm water diversion, the construction of an internal concrete power floated slab finished to FM2 flatness and the completion of all external work finishes.

The site clearance generated approximately 1200T of 6f2 crushed granular which formed part of the pile mat with the remaining balance of 4500T of recycled 6f2 being transported in from Smith Materials Recycling Centre at Moreton Valence, Gloucester.

The internal slab preparation involved the services of our Laser Levelling division which levelled and compacted 4000m2 of Type 1 to the required tolerances.

The external works involved 2000m2 of permeable block paving to car parking bays, the construction of tarmac access roads, block paved footpaths and included a concrete service apron to 2 of the 4 building elevations of in which all were finished to a high standard.

Steve Dixon, Site Manager from Barnwood Construction commented “I would like to take this opportunity to thank Smiths for their cooperation with this project and in particular Tim who has been a credit to your company. Thanks to all your employees that have worked on this project and have helped Barnwood in producing a first class facility for Triumph.”

 


4th May 2016

«
»

Call us on 01453 822227