Case Studies

Foxhangar Marina
Construction of a new Marina in partnership with Land and Water group. Location - Kennet and Avon Canal near Devizes Wiltshire.
Download Case Study: Caen Hill Marina Project
Private Client Construction Project
Conctruction of bespoke Underground Garage
Download Case Study: Underground Garage Construction
MS Junc 12 Project
Construction of both Southbound and Northbound slip roads.
Download Case Study: M5 Junction 12 Improvment
Ellenborough Park Hotel
Major development of prestigious Cotswold Hotel
Download Case Study: Ellenborough Park Hotel
Construction of Gloucester SW Bypass
Smiths Construction shift over 250000 tonnes in major road construction.
Download Case Study: Castlemead
Major road construction
Construction of transport infrastructure in Gloucester
Download Case Study: Netheridge